beautypg.com

Wayne-Dalton LIGHT COMMERCIAL DOOR 6100 User Manual

Page 13

background image

13

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the

Find a Dealer section online at www.wayne-dalton.com

Tools Needed:

iNST

alla

Tio

N

Top Section

Place the top section in the opening and vertically
align with lower sections.

Temporarily secure the top section by driving a nail in
the header near the center of the door and bending
it over the top section. Now flip up hinge leaf against
section, fastening center hinges first, and end hinges
last. (Refer to Step 6).

When installing a door with a Torquemaster

®

Plus

counterbalance system, vertical track alignment is
critical. Position flagangle between 1-11/16” (43 mm)
to 1-3/4” (44 mm) from the edge of the door. Tighten
the bottom lag screw. Flagangles must be parallel to
the door sections.

Repeat for opposite side.

imPoRTaNT: ThE DIMENSION bETWEEN ThE
FLAGANGLES MUST bE DOOR WIDTh PLUS 3-3/8”
(86MM) TO 3-1/2” (89 MM) FOR SMOOTh, SAFE
DOOR OPERATION.

Complete the vertical track installation by securing
the center jamb bracket(s) and tightening the other
lag screws. Push the vertical track against the rollers
so that the rollers are touching the deepest part of
the curved side of the track (see illustration); tighten
all the track bolts and nuts.

Repeat for opposite side.

hammer

Tape Measure

Power Drill

7/16” Socket Driver

Step Ladder

Flagangle

Top

Section

Nail

Top section

Door width

+3-3/8” to 3-1/2”

10

1-11/16”

To 1-3/4”

Roller against

vertical track