beautypg.com

Vertical track – Wayne-Dalton LIGHT COMMERCIAL DOOR 6100 User Manual

Page 10

background image

10

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the

Find a Dealer section online at www.wayne-dalton.com

Tools Needed:

Tools Needed:

bottom
section

5/16 X 1-5/8”

Lag screws

Flagangle

Vertical track

assembly

jamb

bracket

5

vertical Track

3/16” Drill bit

Power Drill

7/16” Socket Driver

Tape Measure

Level

Step Ladder

imPoRTaNT: ThE TOPS OF ThE VERTICAL TRACkS

MUST bE LEVEL FROM SIDE TO SIDE. IF ThE bOTTOM

SECTION WAS ShIMMED TO LEVEL IT. ThE VERTICAL

TRACk ON ThE ShIMMED SIDE, MUST bE RAISED

ThE hEIGhT OF ThE ShIM.

Position the left hand vertical track assembly over

the rollers of the bottom section. Make sure the

counterbalance cable is located between the rollers

and the door jamb. Drill 3/16” pilot holes for the lag

screws.

Loosely fasten jamb brackets and flagangle to the

jamb using 5/16” x 1-5/8” lag screws. Tighten lag

screw securing bottom jamb bracket to jamb, to

maintain 3/8” to 5/8” spacing. hang counterbalance

cable over flagangle.

Repeat for the right hand side.

bottom section

Vertical

track

Roller

3/8” To 5/8”

FLAGANGLE

5/16” x 1-5/8”

Lag screw

jamb bracket

Lag

screw

Locations

Stacking Sections

NoTe: For door section identification see page 4.

NoTe: Make sure hinges leafs are flipped down,
when stacking another section on top.

NoTe: Larger doors will use long shaft rollers with
double wide end hinges.

Place rollers in hinge tubes of the second section
(lock section). With assistance, lift second section and
guide rollers into the vertical tracks. keep sections
aligned and fasten hinges to connect the sections
using 1/4” - 14 x 5/8” self-tapping screws. Repeat
for other section(s) except top section.

imPoRTaNT: PUSh & hOLD ThE hINGE LEAFS
AGAINST SECTION WhILE SECURING WITh 1/4” - 14
X 5/8” SELF-TAPPING SCREWS. END hINGES hAVE
(2) SCREWS AND INTERMEDIATE hINGES hAVE (3)
SCREWS. DOUbLE END hINGES hAVE (5) SCREWS.

NoTe: Install lock at this time (sold separately) see
instructions in OPTIONAL SIDELOCk INSTALLATION
on page 21.

6

Power Drill

7/16” Socket Driver

INTERMEDIATE hINGES

(3) 1/4” - 14 X 5/8”

Self-tapping screws

Lock

section

SINGLE END hINGES

(LEFT hAND ShOWN, RIGhT hINGE

SYMMETRICALLY OPPOSITE)

bottom
section

hinge leafs must be flipped
down

(2) 1/4” - 14 X 5/8”

Self-tapping screws

DOUbLE END hINGES

(LEFT hAND ShOWN, RIGhT hINGE

SYMMETRICALLY OPPOSITE)

(5) 1/4” - 14 X 5/8”

Self-tapping screws