beautypg.com

Toshiba RAV-SM1101BT-E User Manual

Page 46

background image

44

11. Defrost control



In heating operation, defrost operation is performed when TE sensor temperature satisfies any

condition in A zone to D zone.

‚

The defrost operation is immediately finished if TE sensor temperature has become 12°C or more, or

it also is finished when condition of 7°C

TE < 12°C has continued for 1 minute. The defrost operation

is also finished when defrost operation has continued for 10 minutes even if TE sensor temperature
has become 7°C or lower.

ƒ

After defrost operation has finished, the compressor and the outdoor fan start heating operation after

stopped for approx. 50 seconds.

Start of heating operation

a

b

c

d

T

SM560

28

28

28

60

120

A zone

B zone

C zone

D zone

Defrost operation is performed in this zone when TE0-TE

3 continued for T seconds.

Defrost operation is performed in this zone when TE0-TE

3 continued for T seconds.

Defrost operation is performed when this zone continued for T seconds.

Defrost operation is performed when this zone continued for T seconds.

0

10

15

c

b

a

d

[min]

*

TE [˚C]

–5

–10
–13

–18

A z

A zone

one

B z

B zone

one

C z

C zone

one

D z

D zone

one

A zone

B zone

C zone

D zone

* The minimum TE value between 10 and 15 minutes after heating operation has started is stored in memory as TE0.

SM800, SM1100, SM1400

34

40

55

90

20

This manual is related to the following products: