beautypg.com

Toshiba RAV-SM1101BT-E User Manual

Page 108

background image

106

Front panel

Roof plate

RAV-SM1100AT-E / RAV-SM1400AT-E

No.



Part name

Common
procedure

Procedure

REQUIREMENT

Before works, put on gloves, otherwise an
injury may be caused by parts, etc.

1. Detachment
1) Stop operation of the air conditioner, and

turn off switch of the breaker.

2) Remove the front panel.

(ST1T Ш4 Ч 10, 3 pcs.)

• After removing the screws, remove the

front panel while drawing it downward.

3) Remove the power cable and the indoor/

outdoor connecting cable from cord clamp
and terminal.

4) Remove the roof plate.

(ST1T Ш4 Ч 10, 6 pcs.)

2. Attachment
1) Mount the roof plate.

(ST1T Ш4 Ч 10, 6 pcs.)

2) Connect the power cable and the indoor/

outdoor connecting cable to terminal, and
then fix them with cord clamp.

REQUIREMENT

Be sure to fix the power cable and the
indoor/outdoor connecting cable with
bundling band on the market along the
inter-unit cable so that they do not come to
contact with the compressor, the valve and
the cable at gas side, and the discharge
pipe.

3) Attach the front panel.

(ST1T Ш4 Ч 10, 3 pcs.)

Remarks

This manual is related to the following products: