beautypg.com

Roberts-gordon llc – Roberts Gorden 175 User Manual

Page 5

background image

© 2012

Roberts-Gordon LLC

All rights reserved. No part of this work covered by the copyrights herein may be reproduced
or copied in any form or by any means - graphic, electronic, or mechanical, including
photocopying, recording, taping or information storage and retrieval systems - without the
written permission of Roberts-Gordon LLC.

Printed in U.S.A.

TABLE OF CONTENTS

SECTION 1: Heater Safety...................................................... 1

1.1 Manpower Requirements ............................................. 1
1.2 Safety Labels and Their Placement ............................. 1
1.3 California Proposition 65 .............................................. 1
2.1 Wall Tag ....................................................................... 5
2.2 Corrosive Chemicals.................................................... 5
2.3 National Standards and Applicable Codes .................. 5

SECTION 3: Critical Considerations ..................................... 6

3.1 Basic Information ......................................................... 6
3.2 Manufactured Units...................................................... 6
3.3 Location and Suspension ............................................ 6
3.4 Minimum Required Installation Clearances ................. 6
3.5 Ventilation .................................................................... 6
3.6 Gas Supply .................................................................. 6
3.7 Electrical Supply .......................................................... 6
3.8 Vent.............................................................................. 6

SECTION 4: Clearances TO combustibles............................ 7

4.1 Required Clearances To Combustibles........................ 7
4.2 Clearances To Combustibles ....................................... 7

SECTION 5: National Standards and Applicable Codes ..... 8

5.1 Gas Codes................................................................... 8
5.2 Aircraft Hangars ........................................................... 8
5.3 Parking Structures and Repair Garages ...................... 8
5.4 Electrical ...................................................................... 8
5.5 Venting......................................................................... 8
5.6 High Altitude ................................................................ 9

SECTION 6: Heater installation............................................ 10

6.1 General ...................................................................... 10
6.2 Suspension ................................................................ 10

SECTION 7: Venting.............................................................. 11

7.1 Venting ....................................................................... 11
7.2 Vent Installation .......................................................... 11
7.3 Unvented Operation ................................................... 12
7.4 Horizontal Venting ...................................................... 12
7.5 Vertical Venting........................................................... 12
7.6 Length Requirements ................................................. 12
7.7 Vent Material............................................................... 13
7.8 Replacing an Existing Heater in a Venting System..... 13

SECTION 8: Air Supply ......................................................... 18

8.1 Separated Combustion Installation ............................ 18
8.2 Unvented Installation ................................................. 18
8.3 Building Ventilation .................................................... 18
8.4 Outside Combustion Air Supply ................................. 18

SECTION 9: Gas Piping ........................................................ 19

9.1 Connections............................................................... 19

SECTION 10: Wiring .............................................................. 21

10.1 Positioning Thermostats .......................................... 21
10.2 Low Voltage Thermostat with One Heater ............... 21
10.3 Low Voltage Thermostat with Multiple Heaters

(Models UHA[X][S]150 - 250) .................................... 22

10.4 Low Voltage Thermostat with Multiple Heaters

(Models UHA[X][S]300 - 400).................................... 23

10.5 UHA[X][S] Series Internal Wiring Diagram............... 24
10.6 UHA[X][S] Series Ladder Wiring Diagram................ 25
10.7 Electrical Connection to the Heater.......................... 26

SECTION 11: Operation and Maintenance ..........................27

11.1 Pre-Start-Up Checks .................................................27
11.2 Begin Start-Up ..........................................................28
11.3 Complete the Start-Up ..............................................30

SECTION 12: User Instructions............................................31

12.1 Heater Operation......................................................31
12.2 Lighting Instructions .................................................31
12.3 Simple Troubleshooting ............................................31

SECTION 13: Servicing .........................................................32

13.1 Servicing Instructions...............................................32
13.2 Burner Maintenance.................................................32
13.3 Fan/Motor Assembly Maintenance ...........................32
13.4 Heat Exchanger Maintenance ..................................32
13.5 Gas Valve Maintenance ...........................................32
13.6 Flue Blower ..............................................................32
13.7 Venting and Air Intake Pipe ......................................33
13.8 Maintenance Checklist .............................................33

SECTION 14: Troubleshooting .............................................35

14.1 General ....................................................................36
14.2 Troubleshooting For Automatic Ignition Burner

Systems...................................................................37

14.3 Troubleshooting for Flame Supervision System .......38
14.4 Troubleshooting for Gas Valves ................................39
14.5 Troubleshooting for Flue Blower ...............................39

SECTION 15: Replacement Parts .........................................40

15.1 Gas Valve .................................................................40
15.2 Burner Compartment ...............................................41
15.3 Ignition Electrode and Flame Probe .........................42
15.4 Heat Exchanger .......................................................43
15.5 Louvers and Louver Spring ......................................43
15.6 Flue Blower .............................................................44
15.7 Pressure Switch........................................................45
15.8 Ignition Control .........................................................45
15.9 Axial Fan/Guard/Motor Assembly.............................45
15.10 Limit Switches ........................................................46

SECTION 16: Specifications.................................................47

16.1 Dimension Data........................................................47
16.2 General Technical Data Table ..................................48
16.3 Technical Data Table ................................................48

SECTION 17: The ROBERTS GORDON

®

COMBAT

®

UHA-Series Warranty .....................................50

This manual is related to the following products: