Raypak HI DELTA HD101 User Manual
Page 3

WARNINGS
4
Pay Attention to These Terms
4
BEFORE INSTALLATION
5
Product Receipt
5
Model Identification
5
Ratings and Certifications
5
Installations at Elevation
5
Component Locations
6
General Information
7
GENERAL SAFETY
8
Time/Temperature Relationships in Scalds 8
INSTALLATION
9
Installation Codes
9
Equipment Base
9
Clearances
9
Combustion and Ventilation Air
11
Conventional Combustion
Air Supply
11
Water Piping
12
Hydronic Heating
14
Domestic Hot Water Piping
16
Gas Supply
17
Electrical Power Connections
19
Venting
21
Outdoor Installation
31
CONTROLS
32
Ignition Control Module
32
Modulating Temperature Control
(Optional)
32
High Limit (Manual Reset)
32
High Limit — Auto Reset (Optional)
32
Flow Switch
33
High and Low Gas Pressure Switches
(Optional)
33
Low Water Cut Off (Optional)
33
WIRING DIAGRAM—MODELS
HD101–HD401
34
HD TROUBLESHOOTING
35
PRE-START-UP
36
Filling System-Heating Heaters
36
Domestic Hot Water Heaters
36
Inspect Venting System
36
Pre-Start-Up Check
36
INITIAL START-UP
36
Tools Needed
36
Preparation for Start-Up
36
Start-Up
38
Main Burner Adjustment
38
Gas Valve Adjustment
38
Gas Type Conversion on Valve
39
Safety Inspection
39
Follow-Up
39
POST START-UP CHECK
40
Air Filter Inspection/Removal
40
Heat Exchanger Removal
41
MAINTENANCE
42
Suggested Minimum Maintenance
Schedule
42
APPENDIX 43
Inside Combustion Air Contamination
43
CONTENTS
3