Rackmount Solutions VA 10000 User Manual
Rackmount Solutions Tools
Table of contents
Document Outline
- UPLIT039 Front Page.pdf
- important safety instructions
- save these instructions.
- Please read and save these instructions. This manual contains important instructions for Chloride models:
- Follow these instructions during installation and maintenance of the UPS and batteries.
- If you have a problem with the UPS, please refer to this manual before calling the Technical Support Department. The Troubleshooting section on pages 20 and 53 address most UPS-related issues.
- This equipment was tested and complies with the limits for a Class A digital device, pursuant to Part 15 of FCC Rules. These lim...
- Chloride Power Protection 28430 N Ballard Drive Lake Forest, IL 60045 USA Telephone: (847) 990-3228 Toll Free: (800) 239-2257 Facsimile: (800) 833-6829
- UPLIT039 TOC.pdf
- Chapter 1 Chloride Introduction 1
- Chapter 2 Display and Operation Elements (Active) 3
- Chapter 3 Active Rackmount Series 7
- Chapter 4 Active Installation and Commissioning 11
- Chapter 5 Operational Characteristics (Active) 13
- Chapter 6 Description of the Interface (Active) 16
- Chapter 7 Maintenance (Active) 19
- Chapter 8 Troubleshooting (Active) 20
- Chapter 9 Technical Support for your Active UPS 21
- Chapter 10 Active Tower and Rackmount Specifications 22
- Chapter 11 Chloride Introduction 27
- Chapter 12 Display and Operation Elements (E-Series) 29
- Chapter 13 E-Series Installation and Commissioning 33
- Chapter 14 Operational Characteristics (E-Series) 41
- Chapter 15 Description of the Interface (E-Series) 44
- Chapter 16 Maintenance (E-Series) 47
- Chapter 17 Troubleshooting (E-Series) 48
- Chapter 18 Technical Support for your E-Series UPS 49
- Chapter 19 E-Series Specifications 50
- UPLIT039 Active and ESeries Rev 0.pdf
- Chapter 1 Chloride Introduction
- Chapter 2 Display and Operation Elements (Active)
- Chapter 3 Active Rackmount Series
- Chapter 4 Active Installation and Commissioning
- Chapter 5 Operational Characteristics (Active)
- Chapter 6 Description of the Interface (Active)
- Chapter 7 Maintenance (Active)
- Chapter 8 Troubleshooting (Active)
- Chapter 9 Technical Support for your Active UPS
- Chapter 10 Active Tower and Rackmount Specifications
- Chapter 11 Chloride Introduction
- Chapter 12 Display and Operation Elements (E-Series)
- Chapter 13 E-Series Installation and Commissioning
- 13.1 Installation of the E-Series (Hardwired)
- 1. Unpack and move E-Series UPS and battery cabinet(s), if supplied, into desired installation location.
- 2. Adjust leveling jacks under the UPS and battery cabinet(s) to remove wheels of the units from the floor and avoid movement of connections.
- 3. Turn off input and output breakers on the back of the UPS and any battery cabinets to be used.
- 4. Turn off and isolate the power source to be used for the UPS input using proper lock-out/tag-out procedures.
- 5. Confirm that the power source to be used for the UPS is 208 V (208/120 3 f for E203).
- 6. Remove the connection plate on the back of the UPS to expose connection terminals.
- 7. Wire input of the UPS by first connecting ground (earth) wire to GND (ground) terminal. Next, connect the input power leads t...
- 8. If the UPS does not have an attached Power Distribution Unit (PDU), wire the output of the UPS to appropriate load as follows:
- 9. Connect the UPS to the battery cabinet(s) (if required)
- 10. Carefully replace the connection plate(s) on the battery cabinet and the UPS, making sure that no wires are pinched or damaged.
- 11. Confirm that all input and output breakers on the UPS and battery cabinet(s) are in the OFF position.
- 12. Restore power source to the UPS.
- Table 7. Minimum Requirements for E-Series UPS Installation
- Fig. 23: Wiring Diagram for the E61
- Fig. 24: Wiring Diagram for the E101
- Fig. 25: Wiring Diagram for the E153 and E203
- Fig. 26: E203 Power System
- 13.2 Commissioning of the E-Series
- 1. Before using the device, charge the batteries for 8 hours.
- 2. After charging, connect the loads to the UPS.
- 3. When the signal interface is used, then the connection cable (accessories) is linked between UPS and computer system. Please see instructions in the documentation for the accessories.
- 4. Switch on the loads.
- 5. Switch on the UPS by operating the switch | on the front panel.
- 13.3 Starting Up the E-Series
- 1. Switch on the input circuit breaker on the back of the UPS.
- 2. When connected to the mains, the batteries automatically begin charging. The UPS may be used immediately, however, full run time will not be available until the batteries are fully charged
- 3. Before using the device, charge the batteries for 8 hours.
- 4. After battery charging is completed, switch on the output circuit breaker at the rear side of the UPS. The loads are now supplied by the UPS.
- 5. If a signal interface cable is used, connect the cable (accessory) between the UPS and the computer system. Please observe further instructions in the documentation for the accessory.
- 6. Switch on the loads.
- 7. Switch on the UPS by operating the switch | at the front plate.
- 13.4 Commissioning of an External Battery Cabinet
- Table 8. External Battery Packs
- Table 9. Technical data of the connection cable
- 13.1 Installation of the E-Series (Hardwired)
- Chapter 14 Operational Characteristics (E-Series)
- Chapter 15 Description of the Interface (E-Series)
- Chapter 16 Maintenance (E-Series)
- 16.1 Storage
- 1. Install the hard-wire connections according to chapter 13 “E-Series Installation and Commissioning” on page 33 at an appropriate source. Switch on the input circuit breaker at the rear of the device for hard- wired connection.
- 2. Switch off the input circuit breaker of the UPS. Then remove the connections of the UPS in an inverted sequence to what is described in chapter 13 “E-Series Installation and Commissioning” on page 33.
- 3. Note the date of charging on the packing.
- 16.2 Cleaning
- 16.1 Storage
- Chapter 17 Troubleshooting (E-Series)
- Chapter 18 Technical Support for your E-Series UPS
- Chapter 19 E-Series Specifications