beautypg.com

Powering up the cfp-20xx, Powering up the cfp-20 xx – National Instruments cFP-20xx User Manual

Page 16

background image

cFP-20xx Quick Start Guide

16

ni.com

7. Powering Up the cFP-20xx

Check the DIP switches on the controller, making sure that the RESET IP switch
is not enabled. Plug in each power supply to the Compact FieldPoint system. The
cFP-20xx runs a power-on self test (POST) that takes several seconds. You should
see the POWER and STATUS LEDs come on. After about five seconds, the
STATUS LED begins flashing steadily. The cFP-20xx is ready to be configured.

If you have already assigned an IP address to the cFP-20xx, the STATUS LED
turns off, and the A, B, C, and D LEDs come on for about 15 seconds as LabVIEW
RT starts up. Once they turn off, the I/O module READY LEDs come on, and the
cFP-20xx is ready for use. The total boot time for a configured system is 30–45
seconds.

If the STATUS LED does not light up as described here, refer to the cFP-20xx and
cFP-BP-x User Manual
.

DIP Switches

Functions

1, 2 .........................User-configurable on

cFP-2000 and cFP-2010;
disabled on cFP-2020

3, 4, 5 .....................User-configurable

6 .............................DISABLE VI

7 .............................SAFE MODE

8 .............................RESET IP

12

3

4

5

68

7

ON