Powerware 9170+ User Manual
Page 5

RACKMOUNT INSTALLATION
EATON Powerware
®
9170
+
Rail Kit (9− and 12−Slot Cabinets) Installation Guide
S
164201420 Rev C www.powerware.com
3
4.
Install six metal clip nuts (nine clip nuts for 12−slot cabinets) onto
each side flange along the front of the cabinet (see Figure 2).
NOTE DO NOT install metal clip nuts in the bottom cabinet section.
Tab Slots
Metal Clip Nuts
Tab Slots
Tab Slots
Metal Clip Nuts
Metal Clip Nuts
Figure 2. Metal Clip Nut and Tab Slot Locations
See also other documents in the category Powerware Tools:
- 5110 (14 pages)
- UPS 1000 - 2200 (24 pages)
- 9 (70 pages)
- 9155 UPS20-30kVA (52 pages)
- 8 - 15 kVA (46 pages)
- 9125 Two-in-One UPS 5000 (66 pages)
- Model V-2000B (137 pages)
- 9335 (100 pages)
- 9120 (5 pages)
- 5115RM (24 pages)
- P93 (6 pages)
- 9390 UPS 100160 kVA (216 pages)
- Horsepower Computer System ST-2400S (17 pages)
- 9155 (10 pages)
- 9125 Two-in-One UPS 2500 (78 pages)
- 5075 kVA (162 pages)
- 380/220V (72 pages)
- 30-160kVA (48 pages)
- Ferrups FE/QFE 500VA (76 pages)
- FSS-0342J (44 pages)
- 9395 UPS and Plus 1 UPS 650825 kVA (192 pages)
- 9315s (205 pages)
- Ferrups FE/QFE UPS (72 pages)
- 9315 UPS (84 pages)
- 5140 (68 pages)
- 9330 (246 pages)
- 9355 (62 pages)
- BladeUPS none (32 pages)
- 5115A USB (44 pages)
- 9170+ (94 pages)
- 9910 p Series (6 pages)
- 9125 (30 pages)
- 4500 (92 pages)
- 9395 (4 pages)
- X-Slot USB Module (10 pages)
- 9150 (64 pages)
- 5105 (4 pages)