beautypg.com

Rackmount installation, Checking the rail kit accessories, Tools required – Powerware 9170+ User Manual

Page 3

background image

EATON Powerware

®

9170

+

Rail Kit (9− and 12−Slot Cabinets) Installation Guide

S

164201420 Rev C www.powerware.com

1

Rackmount Installation

To install a 9− or 12−slot uninterruptible power system (UPS) cabinet into
a rack, you must order a cabinet specifically designed for rackmounting.
Nine− and 12−slot battery cabinets are also available for rackmounting.
These models can be installed in an EIA−standard 48.3 cm (19")
equipment rack and include a rackmounting kit with the brackets and
required hardware.

Checking the Rail Kit Accessories

Verify that the following items are included inside each rail kit:

S

(2) front rails (left and right)

S

(2) rear rails (left and right)

S

(12) #6−32

0.75" screws

S

(12) #6 flat−head washers

S

(12) #6−32 Keps nuts

S

(4) adapter plates

S

(8) #10−32

0.5" pan−head screws

S

(8) #10 washers

S

9−Slot Cabinets:

(12) metal clip nuts

(4) rackmount ears

(12) 1/4−20

1/2" Phillips−head bolts

S

12−Slot Cabinets:

(18) metal clip nuts

(6) rackmount ears

(18) 1/4−20

1/2" Phillips−head bolts

Tools Required

To assemble the components, the following tools may be needed:

S

Medium flat−bladed screwdriver

S

Phillips

®

#2 screwdriver