Preinstallation – PB Heat Gas/Oil Boilers User Manual
Page 7
b) If the foundation must be a concrete slab, use an
air cell high temperature insulating board, at least
1/2 inch thick, with aluminum backing,
aluminum side up. 1/2 inch thick high
temperature millboard with aluminum backing is
acceptable as well. Place the insulating board on
the slab between the steel channels.
F.
INSTALLATION SURVEY
For new and existing installations, a Water Installation
Survey is available from PB Heat, LLC. The survey will
provide information on how a hot water boiler works
with your specific system and will provide an overview
of hot water system operation in general.
You can also use this survey to locate system problems
which will have to be corrected. To obtain copies of the
Water Installation Survey, contact your PB Heat
representative or download it from PeerlessBoilers.com.
G. PLANNING THE LAYOUT
Prepare sketches and notes of the layout to minimize the
possibility of interferences with new or existing
equipment, piping, venting and wiring.
H. VERIFY COMPONENTS
1. Packaged: All components should be inside crate. In
some cases the burner may be shipped separately.
Optional equipment, such as barometric draft
dampers, may also be shipped separately.
2. Knockdown: All components shipped for field
assembly. See Table 1.2 for standard components.
See Tables 1.3 through 1.8 for optional components.
a) Channel Rails
b) Sections
c) Assembly Kit Carton(s): Includes flow port
gaskets, tie rods with hardware, high temperature
rope, and cleanout cover plates.
d) Flue Box Carton: Includes flue box, rear flue
cover plate (LCE only), rear observation
assembly and port cover plates.
e) Baffle Carton
i)
LC: Includes baffles, combustion chamber
liner and rating label.
ii) LCE-21 through LCE-24: Baffles
f)
Jacket Cartons: Include ASME plate
g) Draft Damper (LCE only)
h) Label Carton (LCE only)
i)
Burner Mounting Plate
j)
Trim Carton: Includes safety relief valve and
temperature-pressure gage
k) Control Carton: Limit controls
l)
Tankless Heater(s)
m) Additional controls and fittings
3. Assembled Block: Same as knockdown except
channel rails, sections and assembly kit cartons are
assembled into a block as a single shipping level
component.
5
Table 1.1: Foundation Lengths
LC-04
LC-05
LC-06
LC-07
LC-08
LC-09
LC-10
LC-11
LC-12
LCE-13
LCE-14
LCE-15
LCE-16
LCE-17
LCE-18
LCE-19
LCE-20
LCE-21
LCE-22
LCE-23
LCE-24
Model
Foundation Length, Inches
37
¹⁵⁄₁₆
43
48
¹⁄₁₆
53
¹⁄₈
58
⁵⁄₁₆
63
³⁄₈
68
⁷⁄₁₆
73
¹⁄₂
78
⁹⁄₁₆
83
³⁄₄
88
¹³⁄₁₆
93
⁷⁄₈
98
¹⁵⁄₁₆
104
¹⁄₈
109
³⁄₁₆
114
¹⁄₄
119
⁷⁄₁₆
124
¹⁄₂
129
⁹⁄₁₆
134
⁵⁄₈
139
¹¹⁄₁₆
PREINSTALLATION