Installation, 1 hardware description, 1 injector front panel – Planet Technology POE-2400 User Manual
Page 8: Ardware, Escription
5
2. INSTALLATION
This section describes the hardware features and installation of these PoE Injector Hub on the desktop or rack mount. For
easier management and control of the PoE Injector Hub familiarize yourself with its display indicators, and ports. Front
panel illustrations in this chapter display the unit LED indicators. Before deploy the PoE Injector Hub please read this
chapter completely.
2.1 Hardware Description
The section describes the hardware of the POE-1200 / POE-2400 and gives a physical and functional overview.
2.1.1 Injector Front Panel
The unit front panel provides a simple interface monitoring the PoE Injector Hub .
Figure 2-1 & 2-2
shows front panel of the
POE-1200 / POE-2400.
Front Panel of POE-1200
Figure 2-1 POE-1200 front panel
Front Panel of POE-2400
Figure 2-2 POE-2400 front panel
■ Reset button
At the left of front panel, the reset button is designed for reboot the PoE Injector Hub without turn off and on the power.
Figure 2-3 Reset button of POE-1200 / POE-2400