beautypg.com

Installation, 1 hardware description, 1 injector front panel – Planet Technology POE-2400 User Manual

Page 8: Ardware, Escription

background image

5

2. INSTALLATION

This section describes the hardware features and installation of these PoE Injector Hub on the desktop or rack mount. For

easier management and control of the PoE Injector Hub familiarize yourself with its display indicators, and ports. Front

panel illustrations in this chapter display the unit LED indicators. Before deploy the PoE Injector Hub please read this

chapter completely.

2.1 Hardware Description

The section describes the hardware of the POE-1200 / POE-2400 and gives a physical and functional overview.

2.1.1 Injector Front Panel

The unit front panel provides a simple interface monitoring the PoE Injector Hub .

Figure 2-1 & 2-2

shows front panel of the

POE-1200 / POE-2400.

„

Front Panel of POE-1200

Figure 2-1 POE-1200 front panel

„

Front Panel of POE-2400

Figure 2-2 POE-2400 front panel

Reset button

At the left of front panel, the reset button is designed for reboot the PoE Injector Hub without turn off and on the power.

Figure 2-3 Reset button of POE-1200 / POE-2400

This manual is related to the following products: