beautypg.com

Figure 14, Figure 15 – ParaBody 426103 User Manual

Page 34

background image

34

STEP 15

FIGURE 14

STEP 14

3/8” X 1” BUTTON

HEAD CAP SCREW

3/8” X 1” BUTTON

HEAD CAP SCREW

SHROUD

FIGURE 15

• SECURELY attach the bottom of the front SHROUD (with label) & rear SHROUD to the TOP BOOM using the four previously removed

3/8” X 1” BUTTON HEAD CAP SCREWS. See FIGURE 15.

• SECURELY attach the top of the front SHROUD (with label) & rear SHROUD to the TOP BOOM using the four previously removed

3/8” X 1” BUTTON HEAD CAP SCREWS. See FIGURE 14.

The installation of the 426103 Elastic Cord Conversion Kit is complete. If unsure of proper use of

equipment, call your local Parabody distributor or call the Parabody customer service department at

(800) 328-9714.