Installation – Pelco ESPRIT ES30PC User Manual
Page 8
8
C311M-N (6/06)
Installation
1. When installing the ES30PC/ES31PC Esprit
®
system, allow for sufficient clearance between the top of the unit and overhead obstructions.
This will prevent interference when the enclosure is driven to its maximum elevation of 33 degrees.
2. Remove the transformer module from the base of the system by
loosening the four Phillips screws and lifting the module.
3. Attach the base of the system to an Esprit mount (EWM or EPP)
with the three flathead 10-32 x 1/2-inch screws and washers
(supplied).
MODEL
ES30
ES31
A
16.6
(42.5)
16.9
(42.9)
B
9.4
(23.9)
9.7
(24.6)
C
7.1
(18.1)
7.6
(19.2)
D
4.2
(10.7)
4.6
(11.7)
A
33.0
°
B
C
D
NOTE: VALUES IN PARENTHESES ARE CENTIMETERS;
ALL OTHERS ARE INCHES.
BASE
LOOSEN
PHILLIPS
SCREWS
TRANSFORMER
MODULE
MOUNTING
SCREWS
BASE
MOUNT