4
INTEGRATING THE DOOR TO THE
WATER RESISTIVE BARRIER:
&YUFSJPS
Î
4A
Note: The flashing tape must be applied
approximately 1/2" onto the frame cladding at the
jambs and head. Pre-folding the tape at 1/2" before
removing the paper backing will make it easier to
apply the tape correctly. If the siding is less than 1/2"
thick, adjust the dimension of the fold so the exterior
sealant line will cover the exterior edge of the tape.
A. Apply side flashing tape. Cut two pieces of flashing
WDSHORQJHUWKDQWKHIUDPHKHLJKWRIWKHGRRU
$SSO\RQHSLHFHRQWRWKHIUDPHFODGGLQJRYHU
the nailing fin and onto the water resistive barrier on
HDFKVLGH7KHWDSHVKRXOGH[WHQGDERYHWKHWRS
RIWKHGRRUDQGEHORZWKHERWWRPRIWKHGRRU
Press the tape down firmly while folding down the
H[FHVVWDSHDWWKHWRSDQGERWWRPRIWKHGRRU
P. Doors with a lock strike in the side (jamb) and without a sidelight on the lock side:
'ULOODQGLDPHWHU[GHHSSLORWKROHLQWRWKHURXJKRSHQLQJWKURXJKWKHSUHGULOOHG
holes located in the frame as follows:
3Door Frame Corner:
Drill pilot holes through the pre-drilled hole located in the upper frame corner on the lock
MDPEVLGHDSSUR[LPDWHO\IURPWKHWRSRIWKHGRRUIUDPHKHDG
3Doors with Multi-point Lock:
Drill through the one pre-drilled hole located in each lock strike. (Pull back frame
weatherstrip to locate open hole in strike).
3Center Latch and Deadbolt Lock:
'ULOOWKURXJKWKHPRXQWLQJKROHORFDWLRQV,QVHUWD[VFUHZLQWRWKHSLORWKROHV
making sure it passes through the shim and into the rough opening.
Note: This step does not apply to center latching double doors.
3
SETTING AND FASTENING THE DOOR (continued):
3O
Head
~ 8”
J
a
m
b
3P1
3O
3P
3P3
3P
3P
3P2
3P2
Pull back weatherstrip to expose strike hole.
Flashing
Tape