Conventional and sidewall venting – Lochinvar Shield SNR200-100 User Manual
Page 33
33
The Shield water heater may be installed with a single pipe carrying the flue products to the outside while using combustion air
from the equipment room. The vent pipe may terminate either vertically (FIG. 5-1) above the roof line in a conventional vent
manner or on a sidewall (FIG. 5-2).
Follow the requirements in the General Venting, Sidewall Direct Venting, and Vertical Direct Venting sections for vent material
specifications, vent length requirements, and vent termination requirements.
Combustion and ventilation air must be supplied to the equipment room per the requirements on pages 12 - 14 of this manual
for proper operation of the Shield water heater when utilizing the single pipe method.
Figure 5-1 Vertical Venting w/Room Air
Figure 5-2 Sidewall Venting w/Room Air
5
Conventional and sidewall venting
Installation & Service Manual
TM
- KNIGHT XL KBN800 (6 pages)
- SD (2 pages)
- Copper Fin II CF-1261 (1 page)
- EBS-SUB-02 (2 pages)
- Commercial Water Heater (2 pages)
- 999 - 750 (72 pages)
- JR-SUB-07 (2 pages)
- POWER-FIN PB/PF 2001 (4 pages)
- Squire SSS041 (20 pages)
- Knight Heating Boiler 81-286 (48 pages)
- 1302 (2 pages)
- CH/CF/CP 300-750 (4 pages)
- 000 (80 pages)
- Copper-fin CW-360 (1 page)
- CP-5M-4/08 (52 pages)
- 500 (68 pages)
- 000 - 260 (52 pages)
- 000 - 260 (52 pages)
- TNR-I&S-02 (20 pages)
- ARMOR 150 - 800 (36 pages)
- KNIGHT KB-500 (1 page)
- PB 502 thru 1302 (4 pages)
- PB-1302(M9) (1 page)
- MDN 030 (2 pages)
- 495 (52 pages)
- Hot Water Generator (24 pages)
- Heating Boilers KB 400 thru 801 (4 pages)
- SYNO 1.3 (16 pages)
- SQUIRE SIT119 (24 pages)
- Commercial Gas Glass Lined Tanke Type Water Heater CG200 (28 pages)
- COPPER-FIN CB-0745 (1 page)
- 0402-0752 (2 pages)
- 1.3 (56 pages)
- RPV-I&S (16 pages)
- KNIGHT 400 (48 pages)
- KNIGHT 210 (20 pages)
- Power Fin PF-0502 (M9) (2 pages)
- COPPER-FIN II 402 - 2072 (16 pages)
- 752 (16 pages)
- WATER HEATERS (12 pages)
- EFFICIENCY+ E B N 150 (2 pages)
- Sync Condensing Boiler 1.5 (56 pages)
- EB 150 -- 300 (4 pages)
- CW495-2066 (2 pages)
- CREST 2.5 (60 pages)