beautypg.com

Service – Lochinvar KNIGHT 399 User Manual

Page 12

background image

1

Service

12

Service Manual

1

Service

Sequence of operation

(continued)

Table 1A (continued from previous page) Sequence of operation - space heating and DHW

OPERATION

DISPLAY

8. If the boiler is not part of a cascade, and the DHW call for heat

remains active for more than 30 minutes, and the space heating
call for heat is also active, then the control will turn on the boiler
pump, turn off the DHW pump after 2 seconds, and resume
modulating based on the space heating set point. As long as
both the space heating and DHW calls for heat remain active,
the control will switch back and forth between the two modes
until one of them is satisfied.

BLR: SH 41% RATE
OUT: 123.0F(129)

9. Once both calls for heat are satisfied, the control will turn off the

burner. The blower will remain on for the 10 second postpurge
cycle. Any pumps that are running will continue to run for their
respective pump delay times, then turn off.

BLR: POSTPURGE
OUT: 127.4F(129)

10. Boiler pump off, system pump continues its delay if longer.

BLR: Standby
OUT: 124.7F(129)

11. System pump off.

BLR: Standby
OUT: 122.9F(129)