beautypg.com

Determine boiler location – Lochinvar KNIGHT 51 User Manual

Page 8

background image

TOP
6" MINIMUM

LEFT
24" SERVICE
0" MINIMUM

FRONT
24" SERVICE
6" MINIMUM

BOTTOM
24" SERVICE
0" MINIMUM

1" MINIMUM CLEARANCE
AROUND HOT WATER PIPES

1" MINIMUM CLEARANCE
AROUND VENT PIPE

OPEN FRONT

RIGHT
0" MINIMUM

Figure 1-2 Alcove Installation - Minimum Required Clearances

TOP
6" MINIMUM

LEFT
24" SERVICE
0" MINIMUM

BOTTOM
24" SERVICE
0" MINIMUM

1" MINIMUM CLEARANCE
AROUND HOT WATER PIPES

1" MINIMUM CLEARANCE
AROUND VENT PIPE

CLOSED DOOR

FRONT
24" SERVICE
6" MINIMUM

6"

6"

VENTILATING
AIR OPENING

*

*

AREA OF EACH OPENING:

1 SQ. INCH PER 1000 BTU PER HOUR INPUT
WITH A MINIMUM OF 100 SQ. INCHES.

VENTILATING
AIR OPENING

*

RIGHT
0" MINIMUM

Figure 1-1 Closet Installation - Minimum Required Clearances

ƽ WARNING

For closet installations, CPVC or
stainless steel vent material MUST
BE used in a closet structure due to
elevated temperatures. Failure to
follow this warning could result in
fire, personal injury, or death.

Note: Service clearances are recommendations only.

Note: Service clearances are recommendations only.

ƽ WARNING For alcove installations, CPVC or

stainless steel vent material MUST
BE used in an alcove structure due
to elevated temperatures. Failure
to follow this warning could result
in fire, personal injury, or death.

8

1

Determine boiler location

Installation & Operation Manual