beautypg.com

Installation, Warning – Sanyo BLOOD BANK MBR-304DR User Manual

Page 13

background image

12

INSTALLATION

Installation

1. Remove the packaging materials and tapes

Remove all transportation packaging materials and

tapes. Open the doors and ventilate the unit. If

the outside panels are dirty, clean them with a

diluted neutral dishwashing detergent. (Undiluted

detergent can damage the plastic components.

For the dilution, refer to the instruction of the

detergent.) After the cleaning with the diluted

detergent, always wipe it off with a wet cloth.

Then wipe off the panels with a dry cloth.

2. Adjust the leveling foot

Extend the leveling feet by rotating them as shown

in the figure until they make contact with the floor.

Ensure the unit is level. (Fig. 1)

3. Fix the unit

Two fixtures are attached to the rear of the frame.

Fix the frame to the wall by attaching a rope or

chain between the wall and the fixtures.

4. Install the filter

Install the condenser filter at the front bottom of the

cabinet. (Fig. 2)

4. Ground (earth)

WARNING

Use a power supply outlet with ground (earth) to prevent electric shock. If the power supply outlet is

not grounded, it is necessary to install a ground by qualified engineers.

Never ground the unit through a gas pipe, water main, telephone line or lightning rod. Such

grounding may cause electric shock in the case of an incomplete circuit.

Leveling foot

Fig. 1

Fig. 2