Assembly and adjustments – Shindaiwa T2510 User Manual
Page 6
6
Handle
1. The handle is attached to the outer tube
at the factory and positioned vertically.
See Figure 5.
. Loosen the 4 socket-head cap screws
on the handle and rotate the handle 90
degrees. See Figure 5A.
3. Position the handle forward of the
Handle Positioning Label at the best
position for operator comfort (usually
about 10 inches ahead of the throttle
housing).
4. Secure the handle by alternately
tightening the four socket-head cap
screws in a diagonal or “crisscross”
fashion.
Figure 5
Handle
Outer Tube
Handle
Handle Positioning Label
4 Socket-head Cap
screws
Handle
Outer
Tube
Figure 5A
4 Socket-head Cap
screws
Barrier
Bar
Barrier
Bar
Assembly and Adjustments
251043
3/16-1/4 inch (4-6 mm)
Throttle Free Play
Adjust Throttle Lever Free Play
1. Loosen the air cleaner cover knob and
remove the air cleaner cover.
See Figure 7.
. Loosen the lock nut on the cable
adjuster. See Figure 8.
Cable
Adjuster
Assembly and Adjustments
Figure 7
Figure 8
The throttle lever free play should be
approximately 3/16-1/4 inch (4-6 mm). See
Figure 6. Make sure that the throttle lever
operates smoothly without binding.
If it becomes necessary to adjust the
lever free play, follow the procedures and
illustrations that follow.
Figure 6
3. Turn the cable adjuster in or out as
required to obtain proper free play
3/16-1/4 inch (4-6 mm). See Figure 8.
4. Tighten the locknut.
Lock Nut
5. Reinstall the air cleaner cover.