beautypg.com

Figure 4–9 – Sun Microsystems 8190994 User Manual

Page 61

background image

8. Enable the replication agreements from the master to the hubs and other masters in the

topology.

9. If you have migrated the data, check that replication is in sync.

10. If you have not migrated the data, reinitialize the master from another master in the

topology.

11. If you rerouted client applications (Step 2), you can now route the applications to write to

the migrated master.

The following sequence of diagrams illustrate the migration of a master, as described above.
The first diagram shows the version 5 topology before the migration of the masters.

The first step in migrating a master involves disabling replication agreements, effectively
isolating the master from the topology.

5.x Master A

5.x Master B

6.0 Consumer A

6.0 Consumer B

6.0 Hub A

6.0 Hub B

FIGURE 4–9

Existing version 5 Topology With Consumers and Hubs Migrated

Migration Scenarios

Chapter 4 • Migrating a Replicated Topology

61

Sun Confidential: Registered