Hardware implementation of the lufp7 gateway, On receipt, Introduction to the lufp7 gateway – Schneider Electric Gateway LUFP7 User Manual
Page 13: Gateway, On receipt 2.2. introduction to the lufp7 gateway

14
2. Hardware Implementation of the LUFP7 Gateway
2.1. On Receipt
After opening the packaging, check that the following element is there:
• One LUFP7 Profibus-DP / Modbus RTU gateway.
2.2. Introduction to the LUFP7 Gateway
The cables and other accessories for connecting to Profibus-DP and Modbus networks need to be ordered
separately.
c
d
e
g
f
h
Modbus RTU
Configuration
Legend:
c
Detachable power connector for the
gateway (
24V ±10%).
d
Female RJ45 connector to a PC
running AbcConf configuration
software.
e
Female RJ45 connector for the
downstream Modbus RTU network.
f
Six diagnostic LEDs.
g
Removable cover for the coding
wheels used to configure the gateway,
shown and described in chapter 2.7
Configuring the Profibus-DP
Communication Features, page
22.
The label describing the LEDs is stuck
onto this cover.
h
Female Profibus-DP connector.