beautypg.com

Z9 folding instructions transport – Spirit Z300 User Manual

Page 8

background image

Z9

7

with Incline Cable (upper).

STEP 7

Install the Console onto the Left and Right Handrails with 2 pcs of 5/16” x 1/2” Button
Head Socket Screws by using the M5 Allen Wrench.

PLEASE LOCK DOWN ALL HARDWARE AFTER THE

ACCESSSORIES HAVE BEEN ASSEMBLED.

Do not attempt to move the unit unless it is in the folded and locked position. Be sure the
power cord is secured to avoid possible damage. Use both handrails to maneuver the unit
to the desired position.

To Fold The Treadmill:

Make certain the treadmill is at minimum incline. Lift the treadmill running deck until it
is secured by the locking telescoping tube assembly in center back of base.

To Unfold The Treadmill:

Apply slight forward pressure* on the treadmill running deck with one hand. Pull down on
the unlocking lever and slowly lower the running deck to the floor. The deck will lower
unassisted when it reaches about waist high.

*At the rear roller area to relieve pressure on the locking system.

Z9

The treadmill is equipped with four transport wheels which are engaged when the treadmill
is folded. After folding simply roll the treadmill away.

Z9 Folding Instructions

Transport