Models only), J-400 series, Page 57 – Jacuzzi J - 400 SERIES J - 460 User Manual

Page 62: Danger

background image

Page 57

J-400 Series

Red (L2)

Pigtail

Neutral Bus

Ground

TB2

TB1

Black (L1)

Green

Main

Service

Panel

with

GFCI

2-Pole

GFCI

Breaker

Ground/Bonding Lug**

2-Pole Circuit Breaker with 2-Wire Grounded Load Connection

(3 Wires to Hot Tub, 2-Hot (L1-L2), 1-Ground)

White (N)

Black (L1)

Red (L2)

240 VAC

No Load Neutral Wire

Note: service disconnect not

shown in this diagram.

The control box TB1 terminal

position varies between models.

B

R

Red (L2)

Red (L2)

Pigtail

Neutral Bus

Ground

TB2

Black (L1)

Black (L1)

Green

GFCI Sub Panel*

Main Panel*

2-Pole

GFCI

Breaker

Ground/Bonding Lug**

No Load Neutral Wire

Main Panel with Secondary GFCI Shut-Off Box Using a

2-Pole GFCI Breaker with 2-Wire Grounded Connection

(3 Wires to Hot Tub, 2-Hot (L1-L2), 1-Ground)

TB1

White (N)
Green (Ground)

*GFCI Sub Panel commonly

used when recommended GFCI

does not install in Main Panel.

Note: service disconnect not

shown in this diagram.

The control box TB1 terminal

position varies between models.

B

R

B

A

240 VAC

19.0 Typical spa wiring Diagrams a-B

(north american 60Hz models Only)

DANGER

Turn power off
before servicing. This
task should only be
performed by a quali-
fied technician.

!

RISK OF SHOCK OR
ELECTROCUTION!