beautypg.com

Page 11 – Jacuzzi 2003+ User Manual

Page 15

background image

Page 11

Figure-B - Control Box

1. Terminal Block
2. Bonding Lug
3. Grounding Terminal

TB1

3

2

1

9

10

4

3

7

1

2

2

Figure-A

Equipment Area

1. Control Box
2. Power Supply Entrance(s)
3. 2-Speed Pump #1
4. Heater
5. Spa Drain Valve
6. Pump Drain Plug(s)

7. 1-Speed Pump #2
8. Circulation Pump
9. Optional CD Ozonator (Purchased Separately)
10. Optional Mazzei Injector (Required for CD Ozonator

Use - Purchased Separately)

Flow

Note: Pump Locations Vary by Model

Circulation Pump
Behind Load Box

8

5

6

6

8.

Select the power supply inlet you want to use (Figure A). Feed power
cable to control box, then install it through the large opening provided in
the bottom side of the box.

9.

Connect wires, color to color, on terminal blocks TB1 and TB3 (Figures
C-F, Page 12). TIGHTEN SECURELY! All wires must be hooked up secure-
ly or damage could result.

10. Install control box door and screws and reinstall the cabinet side panels.