Section 6 − operation, 1. operational terms, 2. power switch – Miller Electric PipePro Dual User Manual
Page 25: 3. left/right select switch
OM-230 009 Page 21
SECTION 6 − OPERATION
6-1. Operational Terms
The following is a list of terms and their definitions as they apply to this wire feeder:
General Terms:
Cold Wire Jog
Feeding wire without contactor or gas valve being energized.
Sequence
A portion of the weld program, such as preflow, run-in, start, weld, crater, burnback, and postflow.
Weld Program
A group of sequences that make up a weld cycle.
6-2. Power Switch
1
Power Switch
804 667-B
1
1
Left/Right Select Switch
Pressing the Left/Right Select
switch allows the operator to
choose which side of the units’ con-
trols will operate.
6-3. Left/Right Select Switch
804 668-B
.
Depressing the Left or Right
Gun Trigger also allows the
operator to enable the con-
trols on that side of the unit.
1
See also other documents in the category Miller Electric Tools:
- OM-2241 (32 pages)
- ICE-27C (36 pages)
- Arc Welding Power Source (4 pages)
- INVISION 456 CC (44 pages)
- Welder (132 pages)
- SS-75D12 (44 pages)
- Load Bank LBP-350 (2 pages)
- OM-193 084E (36 pages)
- 750MPa (2 pages)
- APT-1000 (20 pages)
- OM-220 390F (48 pages)
- 271 (48 pages)
- Welding (32 pages)
- DC (72 pages)
- OM-129 (70 pages)
- XLi (24 pages)
- S-64 (36 pages)
- ICE-27T (36 pages)
- PipePro 304 (76 pages)
- AA40GBU (28 pages)
- D-64 (40 pages)
- Auto Arc XLT 165 (48 pages)
- 185 DX (56 pages)
- S-32S (4 pages)
- Big 40 DC/TIG 55500 A (8 pages)
- Big Blue 600D (60 pages)
- Millermatic 140 (60 pages)
- pmn (36 pages)
- LMSW Series (2 pages)
- 1250 (46 pages)
- Trailblazer Pro 350 D (8 pages)
- TS (76 pages)
- S-22P12 (28 pages)
- 602 (40 pages)
- Axcess 300 (56 pages)
- MOG-400 (40 pages)
- WC-24 (20 pages)
- Big Blue 502P (64 pages)
- Dimension 1000 (44 pages)
- DS-74DX12 (52 pages)
- 350 VS (36 pages)
- 24A (32 pages)
- GA-16C (12 pages)
- Big Blue 502D (116 pages)
- OM-229 038D (36 pages)