beautypg.com

Installation, 1 unpacking and contents check, 2 internal battery connection (battery start-up) – MGE UPS Systems 5000 RT User Manual

Page 12

background image

34008030EN/AA

- Page 12

2. Installation

2.1 Unpacking and contents check

2.2 Internal battery connection (Battery start-up)

(40) Pulsar MX 4000 or 5000 UPS.

(41) Two sets of tower stands.

(42) RS232 communications cable

(43) Product documentation.

(44) 4 cable lockers.

(45) Telescopic rails for rack enclosure with mounting
hardware (optional, or standard with NetPack version).

(46) Screw driver.

(47) Solution-Pac power management suite CD-ROM.

(48) Network Management card (optional, or standard in
NetPack version).

(49) 4 IEC 10A output cables.

Packaging must be destroyed according to waste management standards. Recycling icons are displayed for easy selection.

A dangerous voltage is present inside the power module and the battery module. Any operations to be carried out
on these modules must be done so by qualified staff.

1 - Remove the two fixing screws (59) to free
the battery connector.
2 - Push the battery connector so that you can
read

"

Connected

"

.

3 - Secure the two fixing screws (59).

Card Settings

RS232 Download

66074

UPS

data

Reset

100 10

1 2

ON

ETHERNET

RS232

IP=

MAC=00E0D8FF855E

40

41

42

43

44

45

46

48

47

49

60

59

This manual is related to the following products: