beautypg.com

Operation – Multiquip StreetPro Professional Pavement Saw SP118 User Manual

Page 29

background image

Sp118 pavemenT Saw • operaTion manual — rev. #1 (05/03/12) — page 29

OperatiOn

Figure 18. Engine Fuel Valve Lever

4. Place the ENGINE ON/OFF switch located on the

ENGINE (Figure 19) in the "ON" position. Place the

ENGINE ON/OFF switch located on the HANDLEBARS

(Figure 20) in the "ON" (center) position.

Figure 19. Engine ON/OFF Switch (On Engine)

Figure 20. Engine ON/OFF Switch (On

Handlebars)

5. Place the Choke Lever (Figure 21) in the "CLOSED"

position.

Figure 21. Choke Lever

6. Rotate the throttle lever (Figure 22) halfway between

fast and slow for starting. All sawing is done at full

throttle. The engine governor speed is factory set to

ensure optimum blade operating speeds.

Figure 22. Throttle Lever

7. Grasp the starter grip (Figure 23) and slowly pull it out.

NOTICE

The CLOSED position of the choke lever enriches the

fuel mixture for starting a COLD engine. The OPEN

position provides the correct fuel mixture for normal

operation after starting, and for restarting a warm

engine.

CauTion

The engine speed has been set at the factory.

Changing the governor speed could damage the blade

and/or the saw.

This manual is related to the following products: