Installation Instructions
Section 2
2-20
Part Number 000001530
Installation Checklist
Is the Ice Machine level?
Has all of the internal packing been removed?
Have all of the electrical and water connections
been made?
Has the supply voltage been tested and checked
against the rating on the nameplate?
Is there proper clearance around the ice machine
for air circulation?
Has the ice machine been installed where
ambient temperatures will remain in the range of
35° - 110°F (1.7° - 43.3°C)?
Has the ice machine been installed where the
incoming water temperature will remain in the
range of 33° - 90°F (0.6° - 32.2°C)?
Are the ice machine and bin drains separately
vented?
Are all electrical leads free from contact with
refrigeration lines and moving equipment?
Has the owner/operator been instructed regarding
maintenance and the use of Manitowoc Cleaner
and Sanitizer?
Has the warranty registration card been sent to
the factory?
Has the ice machine and bin been sanitized?
Has the ice machine receiver service valve been
opened 100%?
Are the ice machine line set shut-off valves open
100%?
Does the condenser fan motor(s) operate
properly after start-up?
Have all the refrigeration fittings and joints been
leak checked?
Is the line set routed properly?
Is a refrigeration oil trap (S-trap) installed if the
condenser is installed 21 to 35 feet (6.1 to 10.7m)
above the ice machine head?
Has the CVD® condensing unit been installed to
prevent any roofing damage?
Have the refrigeration lines been insulated and
secured properly to prevent vibration?
Has the remote condensing unit been located
where ambient temperatures will remain in the
range of -20° to 120°F (-28.9° to 49°C)?
Is the toggle switch set to ice?
Is the ice thickness control set correctly?
Is the water trough drain plug installed? (The
drain plug is taped to the top of the water pump)
Does the condenser fan motor(s) operate
properly after start-up?
Is the direction of rotation correct on a CVD2075
3ph scroll compressor?