Installation, Quick install, Procedure – GE P485 User Manual
Page 11: Electrical installation, Overview, Quick install –1, Procedure –1, Electrical installation –1, Overview –1, P485 modbus to profibus converter
P485 MODBUS TO PROFIBUS CONVERTER – USER GUIDE
2–1
GE Consumer & Industrial
P485 Modbus to Profibus
Converter
Chapter 2: Installation
Installation
Quick install
PROCEDURE
1.
Snap the P485 on to the DIN-rail (see DIN-rail mounting on page 2–5).
2.
Connect the Profibus cable (see Profibus connector on page 2–2).
3.
Connect the serial Modbus network cable (see Modbus connector on page 2–4 for
details).
4.
Connect a PC using the configuration cable (see Configuration cable on page 2–3).
5.
Connect the power cable and apply power to the unit (see Power connector on page
2–4 for details).
6.
Start the EnerVista P485/D485 Setup software.
7.
Normally, the EnerVista P485/D485 Setup detects the correct serial port. If this does
not occur, select the correct port through the Port menu item.
8.
Configure the P485 using EnerVista P485/D485 Setup and download the configuration
to the unit.
9.
Configure and power-up the Modbus network device for communication.
Electrical installation
OVERVIEW
The location of the various electrical connectors is shown below.