beautypg.com

Sanitization, Caution – GE PNRQ21LBN User Manual

Page 19

background image

ge.com

Sanitizing the Reverse Osmosis System

Sanitize upon installation of the Reverse Osmosis
system and after servicing inner parts, including
replacement of prefilter, postfilter and the
membrane cartridge.

Be sure to wash your hands before handling
inner parts of the system.

CAUTION:

Before sanitizing, be sure to

remove all cartridges. Chlorine will destroy the
Reverse Osmosis membrane cartridge.

1. Follow steps 1 through 4 under Prefilter,

Postfilter and Reverse Osmosis Membrane Cartridge
Replacement Procedure
.

2. Fill the empty canister labeled “Sanitization

Canister” with water to within 1 inch of the
upper opening. Add 1 oz. (2 Tbsp.) ordinary
household bleach. Install canister into the
prefilter canister position by turning to the right
about 1/3 turn until the alignment marks line
up and the canister stops.

3. Install the two additional “sanitiziation canisters”

into the membrane canister and postfilter
openings in the manifold by turning to the right
about 1/3 turn until the alignment marks line
up and the canister stops.

4. Turn ON water supply. Turn ON faucet until

water begins to flow from the faucet, then turn
faucet OFF. Allow system to fill for 10 minutes.

5. Turn faucet ON and allow water to flow for 20

minutes, or until bleach odor is gone. Turn OFF
water supply again. Turn ON faucet to drain
the system.

6. Once the system is drained, turn the faucet OFF

and remove the canisters by turning to the left
about 1/3 turn. Keep these in a safe place until
needed the next time.

19

Sanitization
canisters

Prefilter
position

Consumer Support

Tr

oubleshooting T

ips

Operating Instructions

Safety Instructions

Installation Instructions

This manual is related to the following products: