beautypg.com

Furuno GP-1850WD User Manual

Page 27

background image

4. INCORPORATION OF DGPS BEACON RECEIVER KIT (for GP-1850W)

19

5. Close the cover of GR-7000A passing the two cables out through respective notches in

the cover.

6. Plug PH6P-W-L240 connector to J2 on the GR-7000A through the cover.
7. Wire cable assembly as shown in the figure below.

Reattach this tape as
shown right after the
DGPS connection.

To J8 of
ANLG Board

GN-8091

J1

GR-7000A

J2

J3

Connector
PH6P-W-L240

J2

Wiring the Cable assembly

8. Mount the ANLG board on the heat sink referring to step 2. Fasten cable assy.

S.FL2-2LP0.7-D-WHT (250), 8P connector cable and 6P connector cable by cable tie
(CV-100, supplied) as shown in the figure below. Fix cable assy. S.FL2-2LP0.7-D-WHT
(250) with the vinyl tape.

J8

ANLG Board

6P connector

GN-8091

Cable
tie

8P connector

40 to 45 mm

10 mm

10 mm

MAIN Board

40 to 45 mm

vinyl tape

Attaching cable tie