Fujimoto Fuji Differential Pressure Transmitter FKK 4 User Manual
Page 51
45
Hold the hexagonal area of the vent/drain plug
with a wrench and remove it by turning slowly.
Peel the existing seal tape and wind a new seal
type. Then, screw the vent/drain plug into the
process connection for changing.
Tightening torque: 25N•m (2.5kgf•m) <18ft-lb>
Ensure a space of about 500mm against the cover in order to facilitate check, adjustment, etc.
500
500
500
Process connection
Change of vent/drain plug position
Check space