FloAire Canopy Hood User Manual
Page 26
26
End-panel Installation
1. Unpack the end-panel(s) from the shipping container, being very careful not to dent or scratch the
panels. NOTE: Report any damage to the delivering freight carrier and file a claim if
appropriate.
2. Refer to the project submittal drawings to determine mounting location.
3. Position the end panel with the kinked top located flush against the inside of the hood end and
the rear flange located flush against the rear wall and facing toward the interior of the hood. Refer
to Figure 16.
4. Attach the top edge of the end-panel to the end of the hood using the acorn nuts provided.
Hand
tighten each acorn nut, then use a wrench to add an additional 1/4 turn – do not over tighten.
5. Secure the rear flange to the wall using stainless steel sheet metal screws, being sure to keep the
end panel straight vertically.
6. Caulk all seams between the end-panel and the hood after the hood(s) and hood accessories
have been installed.
End panel Installation (Hoods with Hems on Ends)
Figure 16A
End panel Installation (Hoods with Flanges on Ends)
Figure 16B