Attachment of Side PSP
Figure 11
PSP with a FBSS Configuration
Figure 12
AC-PSP Installation
1. Locate the assembly and unpack it from the crate, being very careful not to dent or scratch the
outer surface. NOTE: Report any damage to the delivering freight carrier and file a claim if
appropriate.
2. If the supply risers are to be field cut, cut the risers in as desired.
3. Locate the ceiling joists which will support the assembly. If using Unistrut®, then securely attach
to the ceiling joist.