IKA C 200 User Manual
Page 22
22
Close the cover by moving it to the left out
of the locking position until it slides down by its-
elf. The decomposition vessel comes into contact
with the igniters via the ignition adaptor.
The "Fill" message will appear.
The inner vessel will be filled with water (ap-
prox. 70 s). The measurement process will begin
as soon as it is full.
QEXTERNAL2
Correction value for the heat energy from other
burning aids e. g. combustible crucible). The de-
fault value is 0.
TESTNO
For each measurement the software automati-
cally assigns a number in the form of yymmddnn,
with jj representing the year, mm the month, dd
the day and nn a consecutive number. You can
also assign your own numbers to the measure-
ments.
Example: TestNo = 0509150 represents the fi rst
measurement on 15 September 2005
Press OK (F1) to apply your entries.
6.4 Performing the measurement
Once you have done all the necessary prepa-
ratory work as described above, the message
”Storage fi lled?” (Tank fi lled?) will appear. Check
that the tank is fi lled with water maintained at
a constant temperature and confi rm by pressing
CONTINUE (F1).
The message appears “Vessel safe locked?“
Make sure the fact that the the decomposition
vessel is duly locked and confi rms you this with
OK (F1).
After in each case 1000 ignitions of an decompo-
sition vessel you are with the message “Vessel x :
1000 ignitions!” pointed out that this decompo-
sition vessel reached one point of maintenance
time and must be submitted of a security exami-
nation.
Confi rming these references by you successively
OK(F1) and OK(F2) press.
This reference does not relieve you of the obliga-
tion to already constandly examine decompositi-
on vessel also before on wear and accomplish the
safety examination if neccessary.
The message appears “Close the cover“.