Hired-Hand Funnel Flow Fans: Metal Pit Transition Fan Combo Installation (24 Funnel Flow Fan) User Manual
Metal pit transition fan combo installation, Warning, Funnel flow fan
HIRED-HAND MFG., INC. • 1733 County Road 68 • Bremen, Alabama 35033 · Phone 256-287-1000 • Fax 256-287-2000
Manual Part No. 4802-5251 Rev 7-07
Page 1 of 6
Warning!
Disconnect all Electrical Power before installing the Pit Transition Fan!
TOOLS REQUIRED
PART NUMBERS
DESCRIPTION
The Pit Transition Combo Unit is used to mount a 24" fan and transition unit to control the air flow from an opening to provide
horizontal exhaust. It is mounted directly to the wall opening. Figure 1 shows the overall dimensions of the Pit Transition
Combo (PTC). The PTC is available in 304 Stainless Steel (6612-0112) or 409 Stainless Steel (6612-0109).
Flat Head Screwdriver
3/8 Bit Driver
Electric Drill
7/16 Wrench
3/8”Nut Driver
7/16 Bit Driver
Part Number
Description
6612-0112
TU-24 304 SS Transition Unit Combo
6612-0109
TU-24 409 SS Transition Unit Combo
IMPORTANT!
Locate packing slip and make sure that all listed parts are enclosed. If not, call your Hired-Hand distributor
immediately. Please read and understand all instructions in this manual before installing the Pit Transition Fan.
Metal Pit Transition Fan Combo Installation
24
"
Funnel Flow Fan
!
!
Figure 1 - Pit Transition Unit Combo
69"
36"
28"
1 1/2"
15"
24"
39"
30"
30"
15 1/2"
24"
2 1/2"
8 1/2"
1 1/2"
28"
Front View
Side View
4"
1 1/2"
31"
Fan Mounting
Flange