beautypg.com

Mk series – General Pump MK Repair Manual User Manual

Page 28

background image

GENERAL PUMP

A member of the Interpump Group

MK SERIES

Page 28

Proceed with the insertion of the valve units (suction and delivery) into the head, paying

attention to the correct insertion sequence of the O-rings and anti-extrusion rings.

The correct assembly sequence of the valve units in the head is the following:

Insert the anti-extrusion ring, exploded view item 4 from Owner’s Manual (1, fig. 92).

Insert the O-ring, exploded view item 5 from Owner’s Manual (1, fig. 93).