beautypg.com

Installation, Vertical vent flashing and installation, Vertical vent termination – Fulton Pulse HW (PHW) Fully Condensing Hydronic Boiler User Manual

Page 27

background image

Questions? Call (315) 298-5121, or visit us online at www.fulton.com

SECTION 2

PHW-IOM-2013-0214

INSTALLATION

2-21

5. Pass the vent pipe through the opening in the fi re stop. If used as a

support, install the support ring around the vent pipe above the fi re
stop. Slide the support ring down to the top of the fi re stop and tighten
it securely to the vent pipe. Firestop supports can support up to 10 feet
of vent pipes and are recommended at all fl oor and ceiling penetrations.
Figure 16. Air intake supply and exhaust vent pipes and fi ttings must be
securely supported.

6. Horizontal sections require supports every 5 feet and at elbows. From

the boiler, all horizontal sections must rise at leas 1/4” per foot, and there
must be no sags or dips where condensate could collect. The upward pitch
is required so condensate will run back to the boiler for collection and
disposal.

7. For vertical through the roof installations all gas vents extending above the

roof by more than 2 1/2 feet must be securely guyed or braced (inside and
outside wall) 2 clamps. Use a support ring to attach guys or braces to the
vent pipe.

NOTE: All venting must be mounted using spring isolators.

Vertical Vent Flashing and Installation

Adhere to the following for vent fl ashing installation:

1. The roof opening should be located and sized such that the vent is vertical

and has the required air space clearance. The roof fl ashing is positioned
with the lower portion of the base fl ange over roofi ng material. See Figure
17.

2. Nail through the upper portion and sides of the base fl ange. Use nail with

neoprene washers or cover the nail heads with a neoprene plastic. Finish
roofi ng around the fl ashing, covering the sides and upper fl ange with
roofi ng material.

Vertical Vent Termination

Adhere to the following for vertical vent termination:

1. The vent pipe must extend through the fl ashing to a height above the roof

as required in Figure 18. A storm collar is installed on the vent pipe over the
opening between pipe and fl ashing.

2. Adhesive material is used over the joint between the vent pipe and the

storm collar. Figure 18. The vent termination is joined to the end of the vent
pipe.

3. Termination height for the vent pipe must be such that no discharge

opening is less than 2 feet horizontally from the roof surface, and the
lowest discharge opening shall be no lower than the minimum height
specifi ed in Fig. 18. These minimum heights may be used provided the
vent is not less than 8 feet from any vertical wall.

!

WARNING

All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct, and strict
adherence to applicable jurisdictional/
professional codes and regulations.