beautypg.com

Install the server, Step 1: initial setup procedures, Nstall – 8e6 Technologies Threat Analysis Reporter TAR User Manual

Page 31: Erver, Quick start setup requirements, Lcd panel setup requirements (for sl and hl units)

background image

8

e

6 T

hreaT

a

nalysis

r

eporTer

Q

uick

s

TarT

G

uide

i

nstall

the

s

erver

Step 1: Initial Setup Procedures

This step requires you to link the workstation to the Threat Analysis Reporter. You have

the option of using the text-based Quick Start setup procedures described in Step 1A, or,

if you have an SL or HL unit, the LCD panel setup procedures described in Step 1B.

Quick Start Setup Requirements

Threat Analysis Reporter unit with AC power cord

either one of two options:

PC monitor with AC power cord and keyboard, or

PC laptop computer with HyperTerminal and serial port cable (and USB DB9 se-

rial adapter, if there is no serial port on your laptop)

NOTE: Before installing the Threat Analysis Reporter server, the R3000 server

to be used with this server must already be installed and running software version

2.0.10 or higher.

Go to Step 1A to execute Quick Start Setup Procedures.

LCD Panel Setup Requirements (for SL and HL Units)

The following hardware is required for LCD panel setup procedures, if using an SL or HL

unit:

Threat Analysis Reporter SL or HL with AC power cord(s)

Bezel with LCD panel mounted on chassis front

Go to Step 1B to execute LCD Panel Setup Procedures.