IBM Nortel 10 User Manual
Page 21
4.
Remove
the
filler
module
from
the
selected
bay.
Store
the
filler
module
for
future
use.
5.
If
you
have
not
already
done
so,
touch
the
static-protective
package
that
contains
the
GbE
switch
module
to
any
unpainted
metal
surface
of
the
BladeCenter
unit
or
any
unpainted
metal
surface
on
any
other
grounded
rack-component
for
at
least
2
seconds.
6.
Remove
the
GbE
switch
module
from
its
static-protective
package.
7.
Make
sure
that
the
release
latch
on
the
GbE
switch
module
is
in
the
open
position
(perpendicular
to
the
module).
8.
Slide
the
GbE
switch
module
into
the
applicable
I/O-module
bay
until
it
stops.
I/O module
Release latch
RS232
TX/RX
LINK
1
TX/RX
LINK
2
TX/RX
LINK
3
TX/RX
LINK
4
3
9.
Push
the
release
latch
on
the
front
of
the
GbE
switch
module
to
the
closed
position.
After
you
insert
and
lock
the
GbE
switch
module,
it
is
turned
on,
and
the
power-on
self-test
(POST)
runs
to
verify
that
the
GbE
switch
module
is
operating
correctly.
The
POST
results
are
displayed
by
the
status
LEDs.
10.
Make
sure
that
the
LEDs
on
the
GbE
switch
module
indicate
that
it
is
operating
correctly.
Make
sure
that
the
OK
LED
on
each
GbE
switch
module
is
lit.
See
for
a
description
of
the
operation
of
these
LEDs.
11.
If
you
have
other
GbE
switch
modules
to
install,
do
so
now;
otherwise,
go
to
step
Chapter
2.
Installing
and
removing
the
GbE
switch
module
11