beautypg.com

Hoshizaki KM-101BAH User Manual

Page 19

background image

18

G. Final Checklist

WARNING

CHOKING HAZARD: Ensure all components, fasteners, and thumbscrews are
securely in place after installation. Make sure that none have fallen into the storage
bin.

1) Is the icemaker level?

2) Is the icemaker in a site where the ambient temperature is within 45°F to 100°F (7°C to

38°C) and the water temperature within 45°F to 90°F (7°C to 32°C) all year around?

3) Is there at least 2” (5 cm) clearance at the right side for proper air circulation and at

least 0.6” (15 mm) clearance at top for ease of maintenance and/or service?

4) Have all shipping cartons, tape, and packing material been removed from the

icemaker? Are the cube guides in their correct positions?

5) Have all electrical and water connections been made? Do electrical and water

connections meet all national, state, and local code and regulation requirements?

6) Has the power supply voltage been checked or tested against the nameplate rating? Is

the power supply a properly grounded, independent 3-prong wall outlet?

7) Are the water supply and drain lines sized as specified? Are the water supply line

shut-off valve(s) and drain valve(s) installed? Has the water supply pressure been
checked to ensure a minimum of 10 PSIG and a maximum of 113 PSIG?

8) Is the compressor snug on all mounting pads? Have the refrigerant lines been checked

to make sure they do not rub or touch other lines or surfaces? Has the fan blade (if
applicable) been checked to make sure it turns freely?

9) Are all components, fasteners, and thumbscrews securely in place?

10) Has the end user been given the instruction manual, and instructed on how to operate

the icemaker and the importance of the recommended periodic maintenance?

11) Has the end user been given the name and telephone number of an authorized service

agent?

12) Has the warranty card been filled out and forwarded to the factory for warranty

registration?