beautypg.com

3. start-up – Henny Penny MP-944 User Manual

Page 11

background image

Model MP-941/942/943/944



3-2. OPERATING

CONTROLS AND

COMPONENTS (Continued)

Figure 3-1

3-3. START-UP

Before using the cabinet, it should be thoroughly

cleaned as described in the cleaning procedures

section of this manual. To put the cabinet into

operation, move each POWER switch to the ON

position and adjust each control to the appropriate

temperature. The power light should illuminate

indicating that the unit is operating. The operating

temperature of this unit should be achieved in

approximately 30 minutes.

3-2

103

This manual is related to the following products: