Liquid Lines

Liquid lines should be sized for a minimum pressure drop to

prevent “flashing”. Flashing in the liquid lines would create

additional pressure drop and poor expansion valve operation.

If a system requires long liquid lines from the receiver to the

evaporator or if the liquid has to rise vertically upward any

distance, the losses should be calculated to determine whether

or not a heat exchanger is required. The use of a suction

to liquid heat exchanger may be used to subcool the liquid

to prevent flashing. This method of subcooling will normally

provide no more than 20

˚

F subcooling on high pressure

systems. The amount of subcooling will depend on the design

and size of the heat exchanger and on the operating suction

and discharge pressures. An additional benefit from the use

of the suction to liquid type heat exchanger is that it can

help raise the superheat in the suction line to prevent liquid

return to the compressor via the suction line. Generally, heat

exchangers are not recommended on R-22 low temperature

systems. However, they have proved necessary on short,

well insulated suction line runs to provide superheat at the

compressor.

Figure 6. Suction P-Traps.

Slope 1/4"

per 10 ft.

toward

compressor

Suction Lines

NOTE: If the suction line must rise to a point

higher than the suction connection on the

evaporator, a suction line trap at the outlet

of the evaporator must be provided.

Horizontal suction lines should slope away from the evaporator

toward the compressor at the rate of 1/4 inch per 10 feet for

good oil return. When multiple evaporators are connected in

series using a common suction line, the branch suction lines

must enter the top of the common suction line.
For dual or multiple evaporator systems, the branch lines to

each evaporator should be sized for the evaporator capacity.

The main common line should be sized for the total system

capacity.
Suction lines that are outside of refrigerated space must be

insulated. See the Line Insulation section on page 11 for more

information.

Suction Line Risers

Prefabricated wrought copper traps are available, or a trap can

be made by using two street ells and one regular ell. The suction

trap must be the same size as the suction line. For long vertical

risers, additional traps may be necessary. Generally, one trap is

recommended for each length of pipe (approximately 20 feet) to

insure proper oil movement. See Figure 6 below for methods of

constructing proper suction line P-traps.