Installation checklist, Installation instructions – Dacor Contemporary 36 Inch Freestanding Professional Gas Smart Range Installation Manual User Manual
Page 50

English
50
Installation instructions
Installation instructions
Installation checklist
WARNING
• To ensure a safe and proper installation, the following checklist should be completed
by the installer.
• Proper installation, which the homeowner shall ensure, is vital to the safe operation of
the range.
- Has the plastic coating been peeled off the outside of the range? Have all packaging
materials been removed from inside the oven?
- Do the leveling legs contact the floor? Is the unit level? See page
- Is the range secured with the provided anti-tip bracket and foot according to these
- Is the range wired and grounded according to these instructions and all applicable
electrical codes? See page
.
- Has the gas supply inlet pressure been measured to ensure that it does not exceed
the maximums stated in these instructions. See page
.
- Is the range connected to the gas supply according to these instructions and all
applicable codes? Did the installer check the gas supply for leaks? Has the gas
regulator cover been re-installed? See page
- Is the oven door properly installed according to these instructions? See page
.
- Have the burner knobs been installed in the proper locations? See page
.
- Are the burners and grates properly installed according to these instructions? See
-
- Has proper operation been verified? Has the warranty been activated on-line or the
warranty card been filled out completely and mailed?
Install_NX9900R_PRORANGE_DOP36M96_DA_DG68-01106C-02_EN+MES+CFR.indb 50
2019-08-13 6:30:56