beautypg.com

Window requirements, Storm window requirements, Attach the top mounting rail seal strip – GE 8,050 BTU Smart Window Air Conditioner Installation Instructions User Manual

Page 11

background image

49-5000433

11

INST

ALLA

TION INSTRUCTIONS

Installation Instructions

1. WINDOW REQUIREMENTS

• These instructions are for a standard

double-hung window. You will need to modify

them for other types of windows.

• The air conditioner can be installed without the

accordion panels if needed to fit in a narrow

window. See the window opening dimensions.

• All supporting parts must be secured to firm

wood, masonry or metal.

• The electrical outlet must be within reach of the

power cord.

2. STORM WINDOW REQUIREMENTS

A storm window frame will not allow the air
conditioner to tilt toward the outside, and will keep
it from draining properly. To adjust for this, attach
a piece of wood to the sill.

WOOD PIECES
WIDTH: 2

Ǝ

LENGTH:

Long enough to fit inside the window

frame.

THICKNESS:

To determine the thickness, place

DSLHFHRIZRRGRQWKHVLOOWRPDNHLWƎKLJKHU

than the top of the storm window frame or the
vinyl frame.
Attach securely with nails or screws provided by
the installer.

ƎKLJKHU

than storm

window frame

Storm window frame

Wood

Sill

ƎKLJKHU

than vinyl frame

(on some windows)

Vinyl frame

A

(With accordion panels)

B

Model

A

B

AEG08, AEN08

´PLQ

´´

AEG10, AEN10,

AEG12

´PLQ

22”- 36”

3. ATTACH THE TOP MOUNTING

RAIL SEAL STRIP

(This step is for AEW08 models only.)

A.

Remove the backing from the top mounting rail
seal strip and attach the seal strip to the bottom
of the top mounting rail, along the front edge.

Top mounting rail

Remove

backing

from seal

strip

Top mounting rail

Seal strip

FRONT VIEW

B.

Install the top mounting rail with 4 Type A
screws from the outside of the case.

Top mounting rail

Bottom

mounting rail