beautypg.com

Installation requirements, Please read and save this guide, Questions – Electrolux Front-Load Gas & Electric Dryer 137382100 A (1106) User Manual

Page 3: Pre-installation requirements, Installation checklist, 240v electric supply (electric dryer), Door reversal, Electrical power, Final checks, Exhaust venting

background image

3

Installation Requirements

Please read and save this guide

Thank you for choosing Electrolux, the new
premium brand in home appliances. These
Installation Instructions are part of our commitment
to customer satisfaction and product quality
throughout the life of your new appliance.

Questions?

For toll-free telephone support in the U.S.: 1-877-
4ELECTROLUX (1-877-435-3287) and in Canada:
1-800-265-8352.
For online support and product information visit
www.electroluxappliances.com.

Pre-installation requirements

Adjustable

pliers

4 inch, rigid metal or

semi-rigid metal exhaust duct work

4 inch rigid metal or

Adjustable

wrench

Metal foil tape
(not duct tape)

External

vent hood

or

Carpenter’s level

Phillips, straight, &

square bit screwdrivers

Universal wrench

supplied with

matching washer

Pipe wrench

for gas
supply

gas line

shutoff valve

(gas dryer)

or

LP-resistant
thread tape

(for natural gas

or LP supply)

½” NPT union flare

adapters (x2) and

flexible gas supply line

(gas dryer)

3-wire or 4-wire

240 volt cord kit

(electric dryer)

4 in.

(10.2 cm)

clamp

Tools and materials needed for installation:

Installation Checklist

240v Electric Supply (Electric Dryer)

‰ Approved NEMA 10-30R or 14-30R service

cord with all screws tight on terminal block

‰ Approved strain relief installed
‰ Terminal access cover installed before initial

operation

Door Reversal

‰ Follow detailed instructions in this guide
‰ Test hinge and latch for function

Electrical Power

‰ House power turned on
‰ Dryer plugged in

Final Checks

‰ Installation Instructions and Use and Care

Guide read thoroughly

‰ Door latches and drum tumbles when cycle

starts

‰ Registration card sent in

Exhaust Venting

‰ Free-fl owing, clear of lint buildup
‰ 4 inch (102 mm) rigid or semi-rigid ducting

of minimal length and turns

‰ NO foil or plastic venting material
‰ Approved vent hood exhausted to outdoors

Leveling

‰ Dryer is level, side-to-side and front-to-back
‰ Cabinet is setting solid on all corners

Gas Supply (Gas Dryer)

‰ Manual shutoff valve present in supply
‰ All connections sealed with approved sealer

and wrench tight

‰ Conversion kit for LP system
‰ Gas supply turned on
‰ No leaks present at all connections -

check with soapy water, NEVER check with
fl ame

This manual is related to the following products: