beautypg.com

6 completing the installation, Completing the installation -9, Section 3.6 – Enterasys Networks 6H308-24 User Manual

Page 35

background image

Completing the Installation

Installation

3-9

c.

Verify that the fiber connection meets the dB loss and cable specifications for multimode
cabling, as outlined in the Cabling Guide.

If a link is not established, see

Chapter 4

before contacting Enterasys Networks. Refer to

“Getting

Help”

in

About This Guide

for details.

3.6

COMPLETING THE INSTALLATION

After installing the module and making the connections to the network, proceed as follows:

1. If the chassis is installed in a rack that has strain-relief brackets, secure the cables by running the

cables along the strain-relief bracket and tying them to the bracket, using cable ties.

2. The module is now ready to be configured through Local Management. Refer to the MATRIX E7

Series and SmartSwitch 6000 Series Modules Local Management User’s Guide for information
on how to access and use Local Management. For details on how to get manuals, refer to

“Related Documents”

in

About This Guide

.

This manual is related to the following products: