beautypg.com

Thermo Pride Spirit Gas TP9C Modulating ECM 97.5% User Manual

Page 45

background image

1083292-UIM-A-0114

Johnson Controls Unitary Products

45

SECTION XIII: START UP SHEET

33" 97% - 98% AFUE Modulating Gas Furnace Start Up Sheet

Proper furnace start up is critical to customer comfort and equipment longevity







































Name

Address

City

State or Province

Zip or Postal Code

Furnace Model

Furnace Serial

Evaporator Coil Model

Evaporator Coil Serial

Upflow

Downflow

Horizontal Left

Horizontal Right

Unit is level

Venting system is the proper size, within the limitations of the chart in the installation

instructions, properly connected to the furnace, and properly pitched

Condensate drain is connected

Filter Type

Intake Size

Exhaust Size

# of 90 Degree Ells

# 0f 45 Degree Ells

Length

Length

# 0f 45 Degree Ells

# of 90 Degree Ells

Polarity is correct (black is L1 (hot), white is N (neutral)

Ground wire is connected

Line voltage value to furnace (volts AC)

Low voltage value between "R" and "C" on furnace control board (volts AC)

Thermostat Type

Other System Equipment and Accessories

Owner Information

Equipment Data

Furnace Configuration

Condensate Management

Venting

Electrical: Line Voltage

Outdoor Unit Model

Outdoor Unit Serial

Filter, Thermostat, Accessories

Filter Location(s)

Connections -- All Per Installation Instructions and Local Code

Gas piping is connected (including drip leg)

Supply plenum and return air are connected

Filter Size

Vent system is connected

Thermostat wiring is complete

Thermostat heat anticipator set to .1 (if present)

Electrical: Low Voltage

Technician Performing Start-Up

Installing Contractor Name

Start-Up Date

Condensate tubing is correctly installed for the furnace position

Continued on next Page

Sidewall

Roof

Sidewall

Roof

Attic

Exhaust

Termination

Intake

Termination

Thermostat cycle rate set to 6 cycles/hour (if present)