beautypg.com

Retrotec 5000 Blower Door with DM32 User Manual

Dm32 blower door quickguide

background image

Water in the tube will result in erroneous readings.

DM32 Blower Door QuickGuide

Step 1:

Prepare the building

Refer to the Gauge QuickGuide and become completely

familiar with its operation before performing a test.

Fireplaces and stoves must be cold with doors

closed (cover ashes).

Close and lock outside doors and windows so they

don’t open during the test.

Open all interior doors leading to conditioned spaces.

Shut off HVAC, combustion appliances, exhaust fans,

dryers, A/C and furnaces. Ensure they will not come on

Turn gas hot water to Pilot.

□ Set up the Door Panel.

Refer to your “Door Panel QuickGuide”

□ Connect the short red tube to the red port on the

gauge.

□ Connect the yellow tube between yellow ports marked

“Ref B” on fan and gauge. If the fan has a green port

(“Input B”), connect the green tube.

□ Connect the Ethernet style Speed Control Cable to the

fan and gauge.

□ Pass the red tube through the Door Panel and toss

the end at least 5 feet away from the fan’s airstream.

Remove or cover

ashes.

Turn gas valve

to Pilot.

Close all windows

and outside doors.

Place gauge near fan, or attach gauge to Door Panel.

Install the fan blowing outdoors. Cover the fan.

Connect power cord between fan and a wall outlet.

Power light must be on.

Step 2:

Install the system

QG303 Page 1 of 4 rev-2015-05-12

www.retrotec.com Support: (888)330-1345 International: +1(604)732-0142 Made in Everson, WA USA

DM32 digital gauge

Cloth panel

Download the “Blower Door Operation Manual” and the

“Residential Pressure & Air Leakage Testing Manual” from

www.retrotec.com Read warnings.

Umbilical cable

Fan

300

5000

6000

Open

B8

B8

This manual is related to the following products: